POWER PLANTS

Bandırma

WIND ENERGY POWER PLANT

As the first operational power plant of Borusan EnBW Enerji, Bandirma WEPP has entered into operation in September 2009. With the capacity increases in July 2010, and in December 2014, total capacity of the Plant has reached 91,1 MW.

  • 91,1 MW
    Installed Power
  • Balıkesir
    City
  • September 2009
    Date of Entering into Operation