Kartaldağı Wind Power Plant, which was established in Nurdağı District of Gaziantep province, is the first wind power plant of Gaziantep province. Kartaldağı WPP with a capacity of 65.55 MW was commissioned on 24 November 2017.
Nurdağı / Gaziantep
Kasım 2017
65,55 MW
Installed Power
19
Number of Turbines
Vestas
Turbine Type
1.7 MILLION
Annual Emission Reduction
(The Number of Tree Equivalent)
(The Number of Tree Equivalent)
51.000
Annually Illuminated
Number of Houses
Annually Illuminated
Number of Houses
76 .000TON CO2
Annual Prevented
Carbon Emission
Carbon Emission
8,8 Million USD
Annual Prevented
Energy Import
Energy Import