WIND POWER
KIYIKOY
KIYIKOY
WPP
Kiyikoy WPP, which was added to the portfolio in 2017, is in Kırklareli Vize District. With the capacity increase realized in 2020, the facility reached a total installed power of 100 MW.
Vize / Kırklareli
2017
100 MW
Installed Power
34
Number of Turbines
Siemens Gamesa
Vestas Turbine Type
Vestas Turbine Type
935 Thousand
Annual Emission Reduction
(The Number of Tree Equivalent)
(The Number of Tree Equivalent)
130.000
Annually Illuminated
Number of Houses
Annually Illuminated
Number of Houses
194 .000TON CO2
Annual Prevented
Carbon Emission
Carbon Emission
22,5 Million USD
Annual Prevented
Energy Import
Energy Import
Certificates
Communication
Kıyıköy WPP
0 288 213 15 40
Public Liaison Officer: Kenan Değirmenci
Click for your questions, complaints, requests and suggestions.
Show On Map